iterate compare · solarIndependent · no affiliate links · NZD incl. GST

System builder guide

From "how much power do we use" to a parts list you can price in the index or the builder, with the New Zealand rules on what you may do yourself and what the law reserves for a licensed electrician. It is written for NZ homes, cabins and vehicles. It is general information, not advice about your house. Every rule is cited so you can read the source; the research notes behind this page carry the full citations and mark what could not be verified.

1. Three kinds of system

Grid-connected, no battery Hybrid (grid + battery) Off-grid
What it does Panels feed the house, surplus exports to the grid As left, plus a battery holds daytime surplus for the evening No grid: panels, battery and inverter carry everything
Core parts Panels, grid-tie inverter, mounting, isolator, cable, monitoring Panels, hybrid inverter, battery, mounting, isolator, cable, monitoring Panels, MPPT charge controller, battery bank, inverter or inverter/charger, fusing, monitoring
Typical NZ home 3 to 6 kW; new installs now average around 6 kW 5 to 10 kW with 5 to 15 kWh Sized to load and winter sun
Who wires it Licensed electrician; high-risk work, inspected Licensed electrician; high-risk work, inspected Extra-low-voltage DC (under 120 V DC) with no 230 V side is not prescribed work; anything at 230 V AC is
Lines company approval Yes, before export Yes, before export No

2. Work out your numbers

Daily use. Your bill or your retailer's app shows kWh per month or year. NZ homes average about 7,000 kWh a year, roughly 20 kWh a day (EECA, BRANZ Level); all-electric homes with heat pumps and a spa run 25 to 40.

Yield. No official NZ table of kWh per kW by city exists; NIWA's SolarView gives a per-address estimate, which is the number to use if you want to be exact. Modelled figures at optimal tilt (PVGIS, 2005 to 2023) run from about 1,140 kWh per kW a year in Invercargill through 1,230 Dunedin, 1,290 Hamilton, 1,340 Christchurch, 1,360 Nelson, 1,390 Auckland and Tauranga, to 1,430 Wellington. A real roof pitched and oriented as it happens to be makes 5 to 15% less than that; the builder applies a 10% roof factor. North is best; east or west costs 10 to 20%; shade costs far more than any panel spec makes back.

Array size. Daily use × 365 ÷ yield = kW of panels to make over a year what you use. 20 kWh a day in Wellington: 20 × 365 ÷ (1,430 × 0.9) ≈ 5.7 kW, or 13 × 440 W panels. EECA's own examples: 7 panels 3.5 kW with a 3 kW inverter, 12 panels 5.5 kW with 5 kW, 24 panels 10 kW with 9 kW; a 5 kW system covers "around 50 to 80%" of an average all-electric 3-person household (EECA). Roof area: about 35 m² for 5 kW, 70 m² for 10 kW.

Inverter size. Arrays are routinely 1.2 to 1.33× the inverter's AC rating (6.6 kW of panels on a 5 kW inverter is the classic pairing) because panels rarely reach nameplate. Since 11/05/2026 lines companies must offer a default export limit of 10 kW where feasible, or a dynamic limit that is 10 kW when the network is not congested (Electricity Authority); the old 5 kW single-phase default still applies on some networks and during congestion, so check yours before sizing above 5 kW.

Battery size (hybrid). Batteries are for the hours after sunset. Take the share of your daily use that happens then (50 to 70% for a working household), multiply by daily use, divide by 0.9 for round-trip losses. 20 kWh × 60% ÷ 0.9 ≈ 13 kWh usable. Batteries come in modules of 2.5 to 5 kWh that stack, so round up to whole modules.

Off-grid. Size for winter, not the annual average: a winter day yields about half the annual mean per kW. Then: system voltage (12 V for very small loads, 24 V for a cabin or van, 48 V above roughly 2.5 kWh a day so currents stay sane); battery Ah = daily Wh × days of autonomy ÷ (V × 0.8) for lithium; MPPT amps = array W ÷ V × 1.25; inverter continuous watts at or above the biggest set of loads you will run at once. A kettle alone is 2,000 W. BRANZ's rule: tilt panels at latitude plus 10° for off-grid (winter bias), latitude minus 10° for grid-tied.

3. Choose the parts

Panels. Current residential modules are 400 to 500 W N-type. Price per watt is the fair comparison and the index shows it. Bifacial gains nothing on a roof. Expect a 10-year product warranty as the floor and 25 years from many makers, with a separate 25-year performance warranty (EECA warranty baselines).

Inverter. For the streamlined connection process it must be installed to AS/NZS 4777.1 and carry a Declaration of Conformity to AS/NZS 4777.2:2020 from an IANZ-recognised lab; in practice Vector, Wellington Electricity and Unison send you to the Australian Clean Energy Council approved-inverter list and Orion keeps its own list. Decide hybrid vs plain grid-tie now: adding a battery to a non-hybrid inverter later means a second inverter. Match phase to your supply. Warranties: 5 years is the floor for string inverters, 10 for microinverters; 10 to 15 is common.

Battery. LFP (LiFePO4) chemistry, 10-year warranties are the norm. Batteries are tied to inverter families (Sungrow with Sungrow, BYD or Pylontech per a compatibility list); check the inverter maker's list before buying the cheapest module. Installation follows AS/NZS 5139 (location, clearances, mechanical protection); batteries do not go in habitable rooms or ceiling spaces.

Mounting. Rails, roof interfaces (tin, tile or Klip-Lok clips) and clamps rated for your wind zone. Roof penetrations are the leak risk; use the manufacturer's flashing system. See §4 on building consent.

Isolation and protection. AS/NZS 5033:2021 (the edition cited in the regulations) no longer requires a rooftop DC isolator; one isolator at the inverter is normal. DC surge protection where the array is remote from the inverter. Cable is 4 or 6 mm² PV1-F/H1Z2Z2; connectors genuine MC4 or Staubli, never mixed brands.

Monitoring. A CT clamp on the switchboard turns the inverter app from "what I generated" into "what I used vs exported", which is the number that decides whether a battery is worth it.

4. What you can legally do yourself

Solar work in NZ sits under the Electricity (Safety) Regulations 2010 (ESR). In short:

5. Connecting to the grid

Distributed generation up to 10 kW is governed by Part 6 of the Electricity Industry Participation Code (Electricity Authority):

  1. Before you buy, get your lines company's application (Wellington Electricity, Vector, Orion, Powerco, Unison and the other 24 each publish one). The streamlined Part 1A path applies when the inverter has an AS/NZS 4777.2:2020 Declaration of Conformity or is on the company's approved list: the company must decide within 10 business days or approval is deemed given, and the application fee is capped at $100 plus $60 for inspection (excl GST). The standard Part 1 path allows 30 business days and a $200 cap. Real examples: Wellington Electricity $100 + $60; Powerco no charge up to 10 kW; Unison $140; Vector by email with no fee stated.
  2. They will want the inverter make and model, nameplate capacity, and your export limit.
  3. Your electrician installs, certifies (CoC), and books the independent inspection (RoI). Part 1A requires the CoC within 10 business days of approval.
  4. Tell your electricity retailer you are exporting so they set up buy-back and reconfigure or replace the meter (import/export meter typically $150 to $210).

6. Buy-back and whether a battery pays

Export rates published on retailer pages in August 2026 (check the page on the day; most are quoted excluding GST): Meridian 15c, 24c winter peak; Powershop 13c, 23c winter peak; Genesis and Frank 12.5c; Mercury 11.1c flat or seasonal time-of-use up to 20.4c; Octopus 19c peak / 14c off-peak (23c / 10c on its battery plan); Ecotricity 21c peak / 16c off-peak; Electric Kiwi 23c on one plan (incl GST); Contact does not publish a rate. From 01/07/2026 the large retailers must offer at least one time-varying export rate, and from 01/04/2026 lines companies pay a rebate for export at peak times (EA).

Import prices are roughly double the flat export rates. That gap is the whole battery case: every kWh shifted from export to self-use is worth the difference. A battery pays back sooner in a house that is empty in the daytime and heavy in the evening, slower where someone is home all day. EECA's June 2025 modelling put system returns at 6 to 14% a year without a battery, with batteries adding 1 to 2 points (EECA); the winter-peak export rates above have improved that since.

7. What it should cost

EECA's indicative installed prices (December 2025): 3 kW $8,500; 5 kW $11,500; 10 kW $20,000; adding a battery $5,000 to $15,000 (EECA). Market surveys in 2026 sit a little under that at around $2 per watt installed. Compare an installer's quote against the parts total from the builder plus labour, certification, inspection and the lines-company fee; if the gap is large, ask which line carries it.

8. Take the list to an installer

Print or copy the builder's parts list. Ask each installer:

The Consumer Guarantees Act applies to anything you buy from a NZ trader regardless of the manufacturer's warranty; gear imported directly leaves you no NZ trader to claim against.